ARNOLD Group – Insulation Systems

ArnoldGroupLogo_web

Company Details

Point of Contact

ARNOLD Group
Insulation Systems

www.arnoldgroup.com

Carl-Zeiss Str. 14
Filderstadt 70794
Germany
Map It

facebook_button

 Twitter_button


Pierre Ansmann

Global Head of Marketing
pierre.ansmann@arnoldgroup.com

P: +49 176 / 10 28 65 33
M: 559-392-8283 (USA)

About ARNOLD

The ARNOLD Group was founded 1949 in Germany and employs approximately 345 staff members at 13 branches all over the world.

With more than 550 installed Insulation Systems on heavy duty gas and steam turbines, ARNOLD is the global leader in designing, manufacturing and installing the most efficient and reliable Single Layer Turbine Insulation Systems.

Furthermore the ARNOLD Field Service Division is capable to Overhaul and maintain all types of SIEMENS V-Unit Gas Turbines.

Products

Gas Turbine Insulation Systems

The advanced ARNOLD Single Layer Insulation System  is available for :

Siemens

SGT6-8000H
SGT5-8000H
V84.3A (SGT6-4000F)
V94.3A (SGT5-4000F)
V84.2 (SGT6-2000E)
V94.2 (SGT5-2000E)
V94.2A (SGT5-3000E)
V64.3A (SGT-1000F)
W501D5A (SGT6-3000E)
W501F (SGT6-5000F)
W501G (SGT6-6000G)
W251
W191

ALSTOM

GT24
GT26
GT13
GT11

Mitsubishi

M501F
M701F
M501G
M501J
M501GAC

GE Energy

Frame 9

Steam Turbine Insulation System

The advanced ARNOLD Single Layer Insulation System is available for all kind of Steam Turbines

Flexible Insulation Blankets for Pipes, Valves, etc… 

  • First Fire in Irsching am 20.12.2007 Zuenden der Gasturbine  SGT5-8000H Irsching 4 von Siemens und E.ONAKTIV Kommunikations-Marketing GmbH, NuernbergFoto by Kurt Fuchs, Am Weichselgarte n  23, 91058 Erlange n , Tel. 09131-777740 www.fuchs-foto.de
  • ag10
  • ag2
  • ag3
  • ag4
  • ag5
  • OLYMPUS DIGITAL CAMERA
  • OLYMPUS DIGITAL CAMERA
  • ag8
  • OLYMPUS DIGITAL CAMERA

Services

Mechanical Siemens V-Unit Gas Turbine Maintenance

  • Minor Standard Inspection within 4-5 days
  • HGPI of approx. 22 days
  • Major Overhaul of approx. 28 days
  • Lifetime Extension of approx. 35 days
  • Additional extended output possible (MW)

Our Services are available for the following Units:

  • V84.3A (SGT6-4000F)
  • V94.3A (SGT5-4000F)
  • V84.2 (SGT6-2000E)
  • V94.2 (SGT5-2000E)
  • V64.3A (SGT-1000F)

Cost saving possibilities for Maintenance Work Scopes also for Gas Turbines which are under OEM LTSA/LTP Contract

  • Problem: OEM Contracts do not cover all work scopes (additional work scopes beyond OEM service contracts are most of the time charged EXTRA)
  • Solution: ARNOLD offers cheaper prices and reduced outage time, as well as experienced staff for additional work scopes in comparison to the OEM

 Advantages:

  • Independence from OEM contracts
  • Cheaper price than OEM for Parts, Refurbishment & Services
  • Same reliability as OEM
  • Same guarantees as OEM
  • Flexibility worldwide due to flat hierarchies, our medium size company, and local partners
  • ARNOLD Quality Standard and continuous Improvement cycle
  • 1-650x365
  • 2-650x488
  • 3-650x488
  • 4-650x488
  • OLYMPUS DIGITAL CAMERA
  • <SAMSUNG DIGITAL CAMERA>
  • 7-650x488
  • 8-650x488
  • 9-650x434
  • 10-650x520
  • 11-650x488
  • 12-650x488
  • 13-650x488
  • 14-488x650
  • 15-650x488
  • 16-488x650
  • 17-650x488
  • 18-650x488
  • SAMSUNG DIGITAL CAMERA
  • <SAMSUNG DIGITAL CAMERA>

Areas of Expertise

Gas Turbines

Steam Turbines

HRSGs 

GAS TURBINES
Repair and overhaul, field

INSULATION

NOISE ATTENUATION
Acoustic enclosures
Silencers

PROFESSIONAL SERVICES

INSULATION

INSULATION