Unit 5 at Lakeland Electric’s McIntosh Power Plant, a 405-MW 1 × 1 combined cycle equipped with the second Westinghouse-designed 501G gas turbine to enter commercial service, has always been willing to share its O&M best practices with fleet colleagues through the 501G Users Group. In the best practice below, Plant Manager Stephen Reinhart and his team offer valuable experience for many large frame owner/operators to consider, not just 501G users.

A challenge plant staff faced was how to monitor the steam turbine/generator to determine proactively if repairs are needed.

To ensure the Unit 5 steam turbine is available when the combined cycle must operate, Lakeland Electric (LE) personnel focus on preventive-maintenance activities to avoid a failure. The steamer is monitored continuously for backpressure on the L-0 blades (especially during shutdowns) and those airfoils are inspected for potential inclusions, and erosion (Fig 7) and tunneling, during operation.

On large steam turbines, the LP section’s L-0 blades can experience cracking because of off-specification operation, including excessive backpressure from the condenser—especially during a shutdown event. Thus, the utility has instituted continuous monitoring of backpressure on the steam turbine that initiates an alarm thusly:

  • Offline—alarm at 4.5 in. Hg; trip at 5.5 in. Hg.
  • Online—alarm at 7.0 in. Hg; trip at 8.0 in. Hg.

Additionally, the steam-jet hogger air ejector automatically comes into service if there is a steam-turbine trip—this to ensure backpressure is maintained.

To verify there are no inclusions in the L-0 blades (Fig 8), LE has instituted periodic inspections (annually at a minimum). The inspections are completed in situ by completing non-destructive examinations (NDE) of the blades. These inspections revealed that erosion was occurring at the trailing edges of the L-0 blades.

The inspections include visual and die-penetrant inspections, and molds are completed. All inspections are done in-situ from the steam-turbine hotwell to verify the potential for tunneling and/or cracking that may lead to a failure of the L-0 airfoils.

Use of continuous monitoring and NDE of L-0 steam-turbine blades have helped determine which ones are most susceptible to failure. These are the steps the utility has taken:

  • Follow OEM recommendations regarding testing intervals—at a minimum.
  • Conduct periodic in-situ NDE of the L-0 blades to ensure they can meet the desired service interval.
  • Implement alarms to notify when a backpressure event may have occurred.
  • Implement control logic to automatically put the hogger air ejector into service if there’s a potential for a backpressure event on the steam turbine.

The benefit of this activity, spearheaded by Scott Cox, NERC engineer, and Steve Reinhart, plant manager, is that the steam turbine continues to operate at desired service intervals.

perihoki perihoki perihoki perihoki perihoki duta76 duta76 duta76 duta76 duta76 All in mahjong jalan menuju keuntungan Bermain tenang untuk jackpot berlapis Cara menjaga ritme menang terus Pak satria taklukan hambatan hidup lewat mahjong Pola mahjong bukan sekedar tebakan All in dengan hati matang menuju scatter hitam Dari nol ke maxwin dalam tujuh putaran Mahjong all in jadi titik balik finansial Mahjong membuka karier programmer Menggandakan peluang lewat spin bertingkat Modal bisnis dari spin mahjong Putaran mahjong berujung pada scatter beruntun Rasa lega saat all in membuka jalan scatter Dari scatter hitam ke hadiah besar Mahjong sumber kedua penghasilan dokter ternama Peluang emas yang jarang terulang mahjong ways Pemain pilih mahjong saat malam Pola spin gila memaksa hasil mengucur tanpa henti Scatter hitam membuka jalan cepat pemula meraih kemenangan Scatter hitam senjata rahasia mahjong ways Spin dewa memaksa scatter hitam turun Saat pikiran tenang all in jadi langkah besar Spin cepat jarang bantu strategi panjang Spin mastery mengubah putaran jadi peluang Spin murah tak lagi disepelekan setelah buka kunci scatter hitam Teknik profesional menang semua sesi Spin berlapis menarik scatter hitam Spin santai mengundang scatter hitam Spin penuh aksi memperlihatkan scatter hitam terus mengalir Teknik medapatkan hasil besar dari spin pertama