Safety a high-profile discussion topic at Frame 6B meetings

The main technical program at Frame 6 meetings begins at 8 a.m. Tuesday morning (June 11 in 2019), following Monday’s engine familiarization workshop and welcome reception and dinner. Roundtable discussions led by members of the steering committee and one of the two invited vendor presentations fill the first-day program until the vendor fair and reception at […]

Safety a high-profile discussion topic at Frame 6B meetings Read More »

European user boosts 6B compressor performance by coating blades, installing HEPA filters

The user-only compressor session in 2018 didn’t include any new topics, at least while the editors were in the room. At most 6B meetings, discussions include filter experience (HEPA in particular in recent years), online and offline washing, corrosives and particulates in the air impacting compressor cleanliness (and how to remove them), inlet bleed heat,

European user boosts 6B compressor performance by coating blades, installing HEPA filters Read More »

Vendor presentations on combustion hardware, fire safety applicable to all engines

With much of the time at Frame 6 meetings devoted to user presentations and deep discussion, there remains limited time for vendor presentations. Each year, the steering committee chooses two third-party vendor presentations in tune with what owner/operators are experiencing in the field. The topics selected for the 2018 meeting dealt with combustion hardware and

Vendor presentations on combustion hardware, fire safety applicable to all engines Read More »

How manual controls help in troubleshooting legacy GE gas turbines

Turbine Tip No. 2, from the Dave Lucier’s PAL Turbine Services O&M solutions library, applies to General Electric Frame 5 models K-LA and M-P, and early 6Bs, 7Bs, and 7Cs, equipped with Y&F fuel regulator and Speedtronic™ Mark I, II, and IV controls. Overfiring a gas turbine during startup can be a serious condition, particularly

How manual controls help in troubleshooting legacy GE gas turbines Read More »

Frame 6 user presentations get high marks from attendees

High wheel-space temperature issues were discussed by an owner/operator with three 42-MW 6Bs (Model 6581B) that had been commissioned in 2003. Two units completed their second major inspections in 2018, the third in 2019. High temperatures were noticed in the second and third turbine stages of one machine during startup following the major inspection. The

Frame 6 user presentations get high marks from attendees Read More »

GE Day allows the OEM to address user concerns in a classroom setting or informal one-on-one

The first presentation after opening remarks reviewed how GE communicates with its customers and the value to plant personnel of the OEM’s Technical Information Letters (TILs), Product Service Safety Bulletins (PSSBs), Product Service Information Bulletins (PSIBs), and GEKs covering installation, product specifications, troubleshooting, maintenance, technical recommendations, etc. There’s much owner/operators can learn by becoming familiar

GE Day allows the OEM to address user concerns in a classroom setting or informal one-on-one Read More »

Checklist of safety TILs and PSSBs affecting 6B gas turbines

Technical Information Letters TIL 2101, Modification of manual lever hoist for safe rotor removal. 2044, Dry flame sensor false flame indication while turbine is offline. 2028, Control settings for GE Reuter Stokes flame sensors. 2025, GE Reuter Stokes FTD325 dry flame sensors, false flame indication. 1986, Braid-lined flexible metal-hose failures. 1918, 6B Riverhawk load-coupling hardware

Checklist of safety TILs and PSSBs affecting 6B gas turbines Read More »

perihoki perihoki perihoki perihoki perihoki duta76 duta76 duta76 duta76 duta76 All in mahjong jalan menuju keuntungan Bermain tenang untuk jackpot berlapis Cara menjaga ritme menang terus Pak satria taklukan hambatan hidup lewat mahjong Pola mahjong bukan sekedar tebakan All in dengan hati matang menuju scatter hitam Dari nol ke maxwin dalam tujuh putaran Mahjong all in jadi titik balik finansial Mahjong membuka karier programmer Menggandakan peluang lewat spin bertingkat Modal bisnis dari spin mahjong Putaran mahjong berujung pada scatter beruntun Rasa lega saat all in membuka jalan scatter Dari scatter hitam ke hadiah besar Mahjong sumber kedua penghasilan dokter ternama Peluang emas yang jarang terulang mahjong ways Pemain pilih mahjong saat malam Pola spin gila memaksa hasil mengucur tanpa henti Scatter hitam membuka jalan cepat pemula meraih kemenangan Scatter hitam senjata rahasia mahjong ways Spin dewa memaksa scatter hitam turun Saat pikiran tenang all in jadi langkah besar Spin cepat jarang bantu strategi panjang Spin mastery mengubah putaran jadi peluang Spin murah tak lagi disepelekan setelah buka kunci scatter hitam Teknik profesional menang semua sesi Spin berlapis menarik scatter hitam Spin santai mengundang scatter hitam Spin penuh aksi memperlihatkan scatter hitam terus mengalir Teknik medapatkan hasil besar dari spin pertama