HRSG January O&M tip: Drain valves
Operate drain valves on different HPSH harps simultaneously, not in sequence, prior to and during hot, pressurized startups. Most operators know it’s important to drain the high-pressure superheater during startup before steam flow is initiated to prevent accumulated water at the bottom of the harps from migrating up some tubes—quenching them and the upper […]
HRSG January O&M tip: Drain valves Read More »