Perryville adds big GE battery for 7F peaker black start
In what GE claims to be the largest gas turbine black-started by a modern battery, Entergy Louisiana has added a 7.4 MWh lithium-ion (nickel-magnesium-cobalt chemistry) unit at its Perryville power station to restart a 2001-vintage, 150-MW 7F.03 peaking gas turbine/generator should grid power be lost. To re-energize the grid, black starts typically require separate gas […]
Perryville adds big GE battery for 7F peaker black start Read More »



