Page 2 – Combined Cycle Journal

Hanwha Power and the new value of the installed fleet

The recent rebranding of Power Systems Manufacturing LLC (PSM) to Hanwha Power is not a cosmetic move. It is a signal that the gas-turbine aftermarket has become strategic again, and an aggressive growth plan paired with innovative engineering is needed to keep up with unprecedented demand. At January’s PSM Asset Managers Conference, a few months […]

Hanwha Power and the new value of the installed fleet Read More »

GEV validates clutchless synchronous condensing on 7F.05

GE Vernova (GEV) has installed and validated a clutchless synchronous condenser solution for its 7F.05 gas turbine, enabling transition between power generation and synchronous condensing modes in minutes. This solution expands asset flexibility and grid support capability and may be applicable to other heavy-duty fleets, including E-, F-, and H-class units, following successful validation. As

GEV validates clutchless synchronous condensing on 7F.05 Read More »

Stop compressor debris at the source with field-applied HVTS

“Stop debris at its source, not after it forms,” cautions Eric Duvekot, VP of Engineering at Integrated Global Services (IGS), as he explains how field-applied high-velocity thermal spray (HVTS) addresses oxide flaking in the hot, high-pressure compressor sections of advanced-class gas turbines, and outlines proof points from OEM testing and fleet experience (Fig 1). The

Stop compressor debris at the source with field-applied HVTS Read More »

Applying FFS in power cycles: Benefits, risks, and best practices

Film forming substances (FFS), including film forming amines (FFA) and other proprietary non-amine based FFS, are increasingly used in steam and HRSG cycles to reduce corrosion during operation and, especially, during shutdown and layup. In a January 27, 2026, CCJ-hosted webinar, the IAPWS Power Cycle Chemistry (PCC) committee explained what current guidance supports, why results

Applying FFS in power cycles: Benefits, risks, and best practices Read More »

CONTROLS: Cooldown procedure options for legacy frames

Legacy Turbine Forum, No. 7 in a series By Luke Williams, PE, Consultant www.geLegacyGasTurbineSupport.com IN THE BEGINNING Engineers who joined the GE gas turbine department in the early days often came from steam turbine design, where cooldown procedures were essential to prevent rotor thermal bow, a condition that can lead to vibration on startup. Several

CONTROLS: Cooldown procedure options for legacy frames Read More »

AIR-COOLED CONDENSERS: Corrosion, wind, and gearboxes drive the next wave of ACC improvements

The 15th annual meeting of the Air-Cooled Condenser Users Group (ACCUG) was held July 29-31, 2025, at the Lake Granbury Conference Center in Granbury, TX. Participants included owner/operators as well as leading suppliers and international consultants gathered to discuss improving unit and system performance, share valuable lessons learned, and reduce overall operating expense. Those interested

AIR-COOLED CONDENSERS: Corrosion, wind, and gearboxes drive the next wave of ACC improvements Read More »

Taking the noise out of turbine monitoring

High-temperature pressure sensors and accelerometers rarely get much attention when they are doing their jobs. But when a combustion dynamics channel goes noisy, a cable loosens, or a monitoring system starts throwing spikes, the consequences can move quickly from nuisance to risk. That was the practical takeaway from Dave Martin, business development manager at PCB

Taking the noise out of turbine monitoring Read More »

Extending the life of legacy gas turbine fleets

Globally coordinated, locally delivered reconditioning supports aging legacy units With mature gas turbine fleets, operators are under increasing pressure to maintain performance, reliability, and availability beyond original design life. Reconditioning has become a critical tool for extending asset life, restoring efficiency, and reducing lifecycle costs while managing outage risk. GE Vernova supports legacy fleets (GT8,

Extending the life of legacy gas turbine fleets Read More »

perihoki perihoki perihoki perihoki perihoki duta76 duta76 duta76 duta76 duta76 All in mahjong jalan menuju keuntungan Bermain tenang untuk jackpot berlapis Cara menjaga ritme menang terus Pak satria taklukan hambatan hidup lewat mahjong Pola mahjong bukan sekedar tebakan All in dengan hati matang menuju scatter hitam Dari nol ke maxwin dalam tujuh putaran Mahjong all in jadi titik balik finansial Mahjong membuka karier programmer Menggandakan peluang lewat spin bertingkat Modal bisnis dari spin mahjong Putaran mahjong berujung pada scatter beruntun Rasa lega saat all in membuka jalan scatter Dari scatter hitam ke hadiah besar Mahjong sumber kedua penghasilan dokter ternama Peluang emas yang jarang terulang mahjong ways Pemain pilih mahjong saat malam Pola spin gila memaksa hasil mengucur tanpa henti Scatter hitam membuka jalan cepat pemula meraih kemenangan Scatter hitam senjata rahasia mahjong ways Spin dewa memaksa scatter hitam turun Saat pikiran tenang all in jadi langkah besar Spin cepat jarang bantu strategi panjang Spin mastery mengubah putaran jadi peluang Spin murah tak lagi disepelekan setelah buka kunci scatter hitam Teknik profesional menang semua sesi Spin berlapis menarik scatter hitam Spin santai mengundang scatter hitam Spin penuh aksi memperlihatkan scatter hitam terus mengalir Teknik medapatkan hasil besar dari spin pertama
Scroll to Top