Klamath reroutes fuel-gas piping above-ground, cuts inspection cost dramatically
TransCanada, Klamath Energy’s fuel-gas supplier, installed its control, filtering, and metering station at the plant fence. The piping network on plant property, serving the gas turbines, auxiliary boiler, and plant heaters, was buried, and expensive to inspect. Buried gas lines serving the facility’s 501F-powered 2 × 1 combined cycle had to be inspected every five […]
Klamath reroutes fuel-gas piping above-ground, cuts inspection cost dramatically Read More »